Loading chat...
MO HB1309
Bill
Status
3/12/2015
Primary Sponsor
Caleb Jones
Click for details
AI Summary
-
Amends Section 227.107, RSMo to specify that highway design-build project contracts must total greater than $50 million per individual project (previously no minimum threshold specified)
-
Limits design-build contracts to no more than 2% of total state highway system projects awarded in any fiscal year, with authority expiring July 1, 2018 unless extended
-
Authorizes additional design-build contracts for specific projects: Missouri Route 364, State Highway 169/96th Street intersection, State Highway 92 (from Highway 169 to Highway E), and US 40/61 I-64 Missouri River Bridge
-
Requires performance bonds equal to estimated total construction cost, with a minimum of $250 million for projects exceeding that amount; payment bonds must be at least equal to performance bond amounts
-
Mandates annual status reports to the General Assembly and Governor comparing design-build outcomes to traditional design-bid-build methods, including cost and timeline assessments
Legislative Description
Specifies that the state highways and transportation commission is authorized to enter into highway design-build project contracts that total greater than $50 million
Last Action
Referred: Transportation(H)
5/15/2015