Loading chat...
MS SB2893
Bill
AI Summary
-
Authorizes the State Bond Commission to issue up to $500,000 in general obligation bonds to fund construction and installation of a traffic signal at the intersection of East Metro Parkway and El Dorado Road in Pearl, Mississippi.
-
Bonds may mature up to 25 years from issue date with interest rates not exceeding limits set in Mississippi Code Section 75-17-101, and no bonds may be issued after July 1, 2028.
-
Creates the "2024 East Metro Parkway/El Dorado Road Traffic Signal Fund" as a separate special fund within the State Treasury to receive bond proceeds and disburse funds to the Mississippi Department of Transportation for the project.
-
Pledges the full faith and credit of the State of Mississippi to guarantee bond payments, with any shortfalls paid by the State Treasurer from the General Treasury.
-
Takes effect July 1, 2024.
Legislative Description
Bonds; authorize issuance for traffic signal at intersection of East Metro Parkway and El Dorado Road in Pearl.
Last Action
Died In Committee
3/27/2024