MT SJ12

Joint Resolution

Status

Passed

4/30/2025

Primary Sponsor

Gregg Hunter

Click for details

Origin

Senate

2025 Regular Session

AI Summary

  • Requests the Legislative Council to assign an interim or statutory committee to study electric transmission capacity on Paths 8, 18, 80, and 83 in Montana

  • Study must analyze economic impacts on Montana citizens and industry from congestion and curtailments on transmission pathways

  • Requires identification of resources in interconnection queues, sampling of market depth and power supply pricing for large loads, and recommendations for specific transmission capacity upgrades with cost-benefit analysis

  • All study aspects, including presentation and review, must be concluded prior to September 15, 2026

  • Final results, findings, and recommendations must be reported to the 70th Legislature

Legislative Description

Interim study on energy transmission

Energy

Last Action

(S) Filed with Secretary of State

4/30/2025

Committee Referrals

Energy, Telecommunications, and Federal Relations3/20/2025
Energy, Technology & Federal Relations2/15/2025

Full Bill Text

No bill text available