Permits the Lower Cape Fear Water and Sewer Authority to use design-build method for constructing water projects within its service area, notwithstanding existing North Carolina procurement statutes (G.S. 143-128, 143-129, 143-131, 143-132, 143-64.31, and 143-64.32).
-
Requires the Authority to prequalify and solicit at least three design-build teams and receive at least three sealed proposals for each project, with proposals not requiring submission of detailed design solutions.
-
Allows the Authority to proceed with fewer than three proposals if the project has been publicly advertised for a minimum of 30 days and three proposals were not received.
-
Mandates the Authority interview at least two of the submitted design-build teams and award contracts to the best qualified team based on project completion time, G.S. 143-128.2 compliance, and cost.
-
Expires December 31, 2015.