Loading chat...
NC H119
Bill
Status
7/1/2011
Primary Sponsor
Robert Gillespie
Click for details
AI Summary
Summary of HB 119 (Session Law 2011-394)
-
Exempts new renewable energy facilities meeting certain criteria from Best Available Control Technology (BACT) requirements for biomass combustion processes.
-
Reduces open burning setback requirements from various distances to 500 feet for land clearing and right-of-way maintenance, and 300 feet for air curtain burners; permits unintentional minor setback noncompliance up to 5% without violation.
-
Allows draft erosion and sedimentation control plans for utility line construction to be submitted without landowner written consent if owner receives prior notice.
-
Clarifies that ABC permittees holding certain liquor permits must not dispose of required recyclable beverage containers in landfills or by incineration.
-
Establishes weather-based irrigation controller requirements for major public facility construction projects and reduces indoor/outdoor water use standards by 20% and 50% respectively.
-
Exempts small dams (25+ feet or 50+ acre-feet) and agricultural pond dams from Dam Safety Act requirements; allows variance process for public water supply well setbacks.
-
Modifies underground storage tank program requirements, including secondary containment deadlines and corrosion protection alternatives.
-
Defines and promotes gray water and rainwater reuse systems while prohibiting county and city ordinances from banning cisterns and rain barrels.
-
Eliminates export certificate fees for ginseng and advances sunset of methane capture pilot program to September 2011.
Legislative Description
Amend Environmental Laws 2011
Last Action
Ch. SL 2011-394
7/1/2011