Loading chat...

NC H857

Bill

Status

Passed

8/23/2013

Primary Sponsor

Dean Arp

Click for details

Origin

House of Representatives

2013-2014 Session

AI Summary

  • Authorizes public entities to use design-build contracts for construction projects, requiring governmental entities to establish written criteria for when this method is appropriate and to solicit qualifications from at least three design-builders.

  • Establishes design-build bridging contracts as an alternative delivery method where a governmental entity contracts separately for design criteria services from the construction phase, with a design criteria professional developing 35% of design documentation before competitive bidding.

  • Enables public-private partnership (P3) construction contracts for projects where private developers provide at least 50% of financing, with requirements for payment bonds equal to 100% of anticipated construction costs and compliance with small business participation goals.

  • Requires all public entities using design-build, design-build bridging, or P3 contracts to report project details to the Secretary of Administration within 12 months of project completion, with failure to report prohibiting future use of these delivery methods until compliance is achieved.

  • Establishes a Purchase and Contract Study Committee to study prequalification standards for public construction projects and report findings to the General Assembly by the 2014 session; law becomes effective 30 days after enactment for projects bid on or after that date.

Legislative Description

Public Contracts/Construction Methods/DB/P3

Last Action

Ch. SL 2013-401

8/23/2013

Committee Referrals

Finance5/16/2013
Finance5/13/2013
Government4/15/2013

Full Bill Text

No bill text available