Loading chat...

NE LB18

Bill

Status

Introduced

1/9/2025

Primary Sponsor

John Cavanaugh

Click for details

Origin

Legislature

109th Legislature

AI Summary

  • Amends section 86-1236 of the Small Wireless Facilities Deployment Act to require local authorities to make compliance determinations before approving new or modified utility pole installations in rights-of-way

  • Authorities must verify that proposed utility pole installations comply with the federal Americans with Disabilities Act of 1990 and its implementing regulations as they existed on January 1, 2025

  • Installations must not obstruct or hinder usual travel or public safety on the right-of-way

  • Installations must not obstruct legal use of the right-of-way by other utilities or impede safe operation of their systems or service provision

  • Authorities are prohibited from permitting utility pole installations that fail to meet any of these three criteria

Legislative Description

Require certain determinations prior to utility pole installations under the Small Wireless Facilities Deployment Act

Last Action

Title printed. Carryover bill

1/7/2026

Committee Referrals

Transportation and Telecommunications1/13/2025

Full Bill Text

No bill text available