Loading chat...
NE LB695
Bill
Status
1/22/2025
Primary Sponsor
Robert Dover
Click for details
AI Summary
-
Lower Elkhorn Natural Resources District is mandated to construct a dam and implement flood control measures to protect Battle Creek and downstream communities
-
The district is prohibited from adopting any engineering design that would accelerate the velocity or volume flow of the Elkhorn River downstream
-
The district must seek and secure available local, state, and federal funding for dam construction and flood control measures
-
Funding efforts should aim to reduce or eliminate the need to raise the district's property tax levy on residents and businesses
-
Legislative findings cite protection of road and rail infrastructure critical to public transportation, agricultural operations, and metal industrial sites in the region
Legislative Description
Require the Lower Elkhorn Natural Resources District to construct a dam and provide for flood control measures
Last Action
Title printed. Carryover bill
1/7/2026