Loading chat...

NJ S648

Bill

Status

Introduced

1/9/2024

Primary Sponsor

Robert Singer

Click for details

Origin

Senate

2024-2025 Regular Session

AI Summary

  • Board of Public Utilities (BPU) must conduct a study within one year to identify short-term solutions enabling the electrical grid to host more distributed energy generation sources like solar and battery storage.

  • BPU must evaluate specific solutions including allowing electricity to flow from distribution systems back to transmission systems through substations, and requiring solar inverters to inject and absorb reactive power.

  • Solar photovoltaic systems and energy storage systems may be required to include technology that responds to weather predictions and controls power output rates.

  • BPU must submit a report with recommendations to the Governor and Legislature within one year, followed by adoption of implementing regulations within one year after the report.

  • Implementation must begin as a regional pilot program before expanding to statewide adoption if determined successful by the BPU.

Legislative Description

Requires under certain circumstances development by certified school nurse of individualized health care plan and individualized emergency health care plan for student with life-threatening allergies or anaphylaxis.

Education

Last Action

Introduced in the Senate, Referred to Senate Education Committee

1/9/2024

Committee Referrals

Education1/9/2024

Full Bill Text

No bill text available