Loading chat...
NJ S2288
Bill
Status
Introduced
1/13/2026
Primary Sponsor
John McKeon
Click for details
AI Summary
- New electric distribution utility poles must be the highest class of wood poles, or if using alternative materials (such as steel or composite), must be the highest class or grade available.
- New and replacement transmission towers must be constructed using the highest class or grade of materials, consistent with federal law and reliability requirements.
- Board of Public Utilities must adopt standards for inspection, maintenance, repair, and replacement of both distribution and transmission equipment.
- BPU must reference applicable national electrical standards when classifying utility poles and transmission towers.
- Electric utilities must submit annual compliance reports to the BPU, which will be made publicly available.
Legislative Description
Establishes requirements for newly installed and replacement electric utility poles and transmission towers.
Economic Growth
Last Action
Introduced in the Senate, Referred to Senate Economic Growth Committee
1/13/2026
Committee Referrals
Economic Growth1/13/2026
Full Bill Text
No bill text available