NJ S745

Bill

Status

Passed

1/13/2026

Primary Sponsor

John Burzichelli

Click for details

Origin

Senate

2026-2027 Regular Session

AI Summary

  • Permits construction of energy transmission and distribution infrastructure (lines, cables, equipment) on preserved farmland in New Jersey with landowner approval, provided no energy generating facilities are placed on the farm itself

  • Requires transmission components to be located within a 50-foot right-of-way positioned as close as practical to the edge of preserved farmland, with underground installations at depths greater than 3 feet

  • Allows automatic approval without State Agriculture Development Committee review for projects meeting the specified requirements; non-conforming projects require committee application with 90-day decision timeline

  • Prohibits the committee from charging application fees and requires it to balance agricultural production needs against state energy needs when making decisions

  • Maintains compliance with Pinelands Protection Act standards for any projects within the designated pinelands area

Legislative Description

Authorizes construction, installation, and operation of certain energy project components on preserved farmland.

Withdrawn Because Approved

Last Action

Withdrawn Because Approved P.L.2025, c.390.

1/13/2026

Committee Referrals

Environment and Energy1/13/2026