NJ S93

Bill

Status

Introduced

1/13/2026

Primary Sponsor

James Holzapfel

Click for details

Origin

Senate

2026-2027 Regular Session

AI Summary

  • New Jersey Board of Public Utilities must adopt standards requiring electric distribution lines to be placed underground in areas affected by major catastrophic events, wherever feasible

  • Applies to all new electric distribution lines installed after the bill's effective date, as well as lines installed, reinstalled, or repaired following damage from a major catastrophic event

  • "Major catastrophic event" defined as natural disasters (hurricanes, tornadoes, floods, ice storms, earthquakes, etc.) causing service interruption to at least 10% of customers in an operating area or triggering a state/federal emergency declaration

  • BPU must consider federal regulations, industry codes, engineering judgment, and utilities' ability to obtain municipal consent, easements, environmental permits, and rights of way when setting standards

  • Takes effect 90 days after enactment

Legislative Description

Requires electric distribution lines to be located underground in areas affected by severe weather or natural disasters.

Economic Growth

Last Action

Introduced in the Senate, Referred to Senate Economic Growth Committee

1/13/2026

Committee Referrals

Economic Growth1/13/2026

Full Bill Text

No bill text available