Loading chat...

NY A01633

Bill

Status

Introduced

1/12/2017

Primary Sponsor

Andrew Hevesi

Click for details

Origin

Assembly

2017-2018 General Assembly

AI Summary

  • Increases the capacity threshold for solar and farm waste electric generating equipment from 1 percent to 5 percent of an electric corporation's 2005 electric demand before the net energy metering program closes to new customers.

  • Increases the capacity threshold for wind electric generating equipment from 0.3 percent to 2 percent of an electric corporation's 2005 electric demand before the net energy metering program closes to new customers.

  • Applies to micro-combined heat and power generating equipment, fuel cell electric generating equipment, and micro-hydroelectric generating equipment alongside solar and farm waste equipment.

  • Maintains the first-come, first-served basis for making net energy metering contracts and schedules available to customer-generators.

  • Takes effect immediately upon enactment.

Legislative Description

Relates to rate schedules for net energy metering.

Last Action

referred to energy

1/3/2018

Committee Referrals

Energy1/12/2017

Full Bill Text

No bill text available