Loading chat...

NY A09472

Bill

Status

Introduced

3/14/2024

Primary Sponsor

William Magnarelli

Click for details

Origin

Assembly

2023-2024 General Assembly

AI Summary

  • Creates a resilient electric vehicle charging system pilot program with a 50 megawatt total capacity cap operating at commercial retail rates with monthly cash-out options.

  • Defines "resilient carbon free power generation" as generating stations with 1.5 megawatts or less capacity, utilizing synchronous generators with black start capability, and no active fossil fuel use.

  • Establishes an "EV microgrid" as a group of energy resources that can operate independently during extended outages (24+ hours) to provide uninterrupted electric vehicle charging and emergency response services.

  • Directs the commissioner and public authorities to promulgate rules and procedures within 180 days to implement the program, including a value stack adder for carbon-free generation and a timely interconnection process.

  • Takes effect immediately upon enactment.

Legislative Description

Requires the commissioner create rules, regulations, policies, and procedures for the creation of a resilient electric vehicle charging system pilot program to provide power through an extended outage.

Last Action

referred to energy

3/14/2024

Committee Referrals

Energy3/14/2024

Full Bill Text

No bill text available