Loading chat...

NY A10229

Bill

Status

Introduced

5/15/2024

Primary Sponsor

Keith Brown

Click for details

Origin

Assembly

2023-2024 General Assembly

AI Summary

  • State parking facilities with 50-200 spaces must install EV charging stations in at least 10% of spaces; facilities with over 200 spaces must install in at least 20% of spaces.

  • EV charging stations on state properties must support minimum 40 amperes and 208 volts, with the Office of General Services responsible for installation, maintenance, and necessary electrical upgrades.

  • New construction with dedicated parking must include EV charging stations and EV-ready parking spaces at varying percentages based on building type: single-family homes need at least one EV-ready space per unit; multi-unit residential buildings need 100% EV-ready spaces with 20% equipped with level 2 chargers; commercial buildings with 1-10 spaces need at least one EV-ready or charging space, and buildings with 11+ spaces need 20% EV-ready spaces with 10% equipped with level 2 or DC fast chargers.

  • Building owners may request waivers from local departments of buildings if compliance presents undue hardship due to utility limitations or geographic constraints.

  • 100% affordable housing buildings are exempt from the new construction requirements; bill takes effect April 1 following enactment.

Legislative Description

Requires electric vehicle charging stations and electric vehicle ready parking spaces in certain new constructions and on state properties.

Last Action

referred to governmental operations

5/15/2024

Committee Referrals

Governmental Operations5/15/2024

Full Bill Text

No bill text available