Loading chat...

NY S01736

Bill

Status

Passed

12/21/2024

Primary Sponsor

Liz Krueger

Click for details

Origin

Senate

2023-2024 General Assembly

AI Summary

  • Requires new construction with dedicated off-street parking (garage, driveway, lot, etc.) to include electric vehicle charging stations and electric vehicle ready parking spaces.

  • One, two, or three-family homes must have at least one electric vehicle ready parking space per dwelling unit; multi-unit residential buildings must have 100% of parking spaces be electric vehicle ready with at least 20% equipped with level 2 charging stations.

  • Commercial buildings with 1-10 parking spaces must have at least one space that is electric vehicle ready or equipped with level 2 or direct current fast charging; buildings with 11+ spaces must have at least 20% of spaces be electric vehicle ready with 10% equipped with advanced charging stations.

  • Owners may apply for waivers demonstrating undue hardship due to utility provider limitations or geographic constraints; multiple charging stations can share circuits when using an electric vehicle energy management system.

  • Takes effect April 1, 2024 and applies to contracts for new construction entered into on or after that date.

Legislative Description

Requires new construction that includes dedicated off-street parking to provide electric vehicle charging stations and electric vehicle ready parking spaces.

Last Action

APPROVAL MEMO.74

12/21/2024

Committee Referrals

Ways and Means6/3/2024
Rules6/3/2024
Energy and Telecommunications1/9/2024
Housing, Construction, and Community Development1/3/2024
Codes6/7/2023
Finance3/28/2023
Energy and Telecommunications1/24/2023
Housing, Construction, and Community Development1/13/2023

Full Bill Text

No bill text available