Loading chat...

NY A00933

Bill

Status

Introduced

1/8/2025

Primary Sponsor

Deborah Glick

Click for details

Origin

Assembly

2025-2026 General Assembly

AI Summary

  • Requires the Office of Renewable Energy Siting to establish uniform standards for the coloring of wind turbine rotor blades at major renewable energy facilities in consultation with the Department of Environmental Conservation

  • Standards must be designed to avoid or minimize bird collisions to the maximum extent practicable

  • Takes effect 180 days after the Federal Aviation Administration determines that colored wind turbine rotor blades are permitted

  • Office of Renewable Energy Siting must notify the Legislative Bill Drafting Commission when the FAA makes its determination to update state law databases

Legislative Description

Relates to the development of uniform standards for the coloring of wind turbine rotor blades, to avoid or minimize, to the maximum extent practicable, any bird collisions arising from the siting, design, construction and operation of a major renewable energy facility utilizing wind turbines.

Last Action

referred to energy

1/7/2026

Committee Referrals

Energy1/8/2025

Full Bill Text

No bill text available