Loading chat...

NY A01443

Bill

Status

Introduced

1/9/2025

Primary Sponsor

Christopher Eachus

Click for details

Origin

Assembly

2025-2026 General Assembly

AI Summary

  • Requires all newly constructed commercial electric vehicle charging stations and public EV charging stations to include an external cutoff switch capable of cutting all power to the vehicle

  • Mandates installation of signage indicating the location of and directions to the circuit breaker box at each charging station

  • Requires a brightly labeled sticker to be placed on the circuit breaker box next to the switch that controls power to the charging station

  • The cutoff switch must be hand-operated and functional without requiring a key or unlocking any device

  • Amends Section 378 of the executive law by adding these requirements as a new subdivision 20

Legislative Description

Requires standards for the new construction of commercial electric vehicle charging stations to require such stations to have an external cutoff switch.

Last Action

referred to governmental operations

1/7/2026

Committee Referrals

Governmental Operations1/9/2025

Full Bill Text

No bill text available