Loading chat...
NY A06304
Bill
Status
3/3/2025
Primary Sponsor
Yudelka Tapia
Click for details
AI Summary
-
Requires all new commercial and residential buildings with dedicated off-street parking to install electric vehicle supply equipment (EVSE) infrastructure at a ratio of one EV-ready space for every five parking spaces
-
Mandates commercial buildings designate space in electrical equipment rooms for future EVSE installation, with raceways at least one inch in size running from panels to designated EV parking spaces, including pull ropes for future wiring
-
Requires new residential construction to provide electrical capacity for a 40-ampere, 240-volt branch circuit for future EV charging, with underground conduit to parking spaces if no garage is present
-
Allows local enforcement agencies to grant exceptions when there is no commercial power supply or when compliance would create unreasonable hardship or be technically infeasible
-
Takes effect 60 days after becoming law and permits local governments to adopt more stringent EV infrastructure requirements
Legislative Description
Requires all new residential and commercial construction that has dedicated off-street parking to implement electric vehicle supply equipment infrastructure in conformance with the requirements of the current edition of the national electrical code.
Last Action
referred to governmental operations
1/7/2026