Loading chat...

NY A08378

Bill

Status

Introduced

5/13/2025

Primary Sponsor

Dana Levenberg

Click for details

Origin

Assembly

2025-2026 General Assembly

AI Summary

  • Adds qualified energy storage systems with a nameplate capacity of 25,000 kilowatts (25 MW) or more that are connected to the state's electricity grid to the definition of "other covered project" under public service law

  • Expands the definition of "major renewable energy facility" to include large-scale qualified energy storage systems, bringing them under the Office of Renewable Energy Siting (ORES) permitting jurisdiction

  • Exempts energy storage systems constructed in cities with a population of one million or more (New York City) from the ORES siting requirements

  • Establishes application fees for proposed energy storage facilities ranging from a minimum of $25,000 to a maximum of $100,000

  • Extends prevailing wage and labor requirements for "covered renewable energy systems" to include qualified energy storage systems of 25 MW or more connected to the grid

  • Takes effect 90 days after becoming law, with authority to begin implementing regulations immediately upon enactment

Legislative Description

Relates to qualified energy storage systems; authorizes energy storage permitting under the office of renewable energy siting and electric transmission.

Last Action

referred to energy

1/7/2026

Committee Referrals

Energy5/13/2025

Full Bill Text

No bill text available