NY A09136

Bill

Status

Introduced

10/17/2025

Primary Sponsor

Michaelle Solages

Click for details

Origin

Assembly

2025-2026 General Assembly

AI Summary

  • Requires new data centers with IT loads greater than 1 megawatt to submit a thermal energy network feasibility assessment to the Public Service Commission before obtaining construction permits, effective January 1, 2027

  • Mandates that applicable data centers capture and reuse waste heat through thermal energy networks, unless the commission determines interconnection is technically infeasible or would cause undue economic hardship

  • Applies to new data center construction and major expansions (25% or more increase in IT load) permitted on or after January 1, 2027

  • Requires facilities where immediate interconnection is infeasible to install thermal recovery equipment and reserve space for future network connections

  • Directs the commission and NYSERDA to adopt rules within 18 months establishing thermal recovery performance standards, interconnection requirements, and reporting protocols, plus maintain a statewide map of thermal energy network opportunities

Legislative Description

Requires the owner or operator of a new data center to submit to the Public Service Commission a thermal energy network feasibility assessment that identifies potential off-site thermal loads within one mile of the facility; requires that new data centers be designed, constructed, and operated to capture and reuse waste heat generated by computing equipment through a thermal energy network.

Last Action

referred to energy

1/7/2026

Committee Referrals

Energy10/17/2025

Full Bill Text

No bill text available