AI Summary

  • Requires owners and operators of macro cell tower sites in New York to equip them with emergency backup power sources capable of maintaining operations for a minimum of 72 hours during power outages

  • Backup power sources must use renewable energy systems, fuel cell electric generating equipment, or energy storage systems

  • Macro cell tower sites with existing backup power sources are exempt until the current system needs replacement, at which point they must comply with the new requirements

  • Defines "macro cell tower site" as locations with wireless telecommunications equipment providing wide area outdoor service, excluding rooftop installations, small cells, and distributed antenna systems

  • Takes effect 90 days after becoming law

Legislative Description

Requires cell towers to be equipped with a back-up power source in case of a power outage.

Last Action

REFERRED TO ENERGY AND TELECOMMUNICATIONS

1/7/2026

Committee Referrals

Energy and Telecommunications1/7/2026
Rules6/13/2025
Energy and Telecommunications2/14/2025

Full Bill Text