Loading chat...
NY S04902
Bill
Status
2/14/2025
Primary Sponsor
Peter Harckham
Click for details
AI Summary
-
Requires owners and operators of macro cell tower sites in New York to equip them with emergency backup power sources capable of maintaining operations for a minimum of 72 hours during power outages
-
Backup power sources must use renewable energy systems, fuel cell electric generating equipment, or energy storage systems
-
Macro cell tower sites with existing backup power sources are exempt until the current system needs replacement, at which point they must comply with the new requirements
-
Defines "macro cell tower site" as locations with wireless telecommunications equipment providing wide area outdoor service, excluding rooftop installations, small cells, and distributed antenna systems
-
Takes effect 90 days after becoming law
Legislative Description
Requires cell towers to be equipped with a back-up power source in case of a power outage.
Last Action
REFERRED TO ENERGY AND TELECOMMUNICATIONS
1/7/2026