Loading chat...

OH SR211

Resolution

Status

Introduced

11/10/2021

Primary Sponsor

Theresa Gavarone

Click for details

Origin

Senate

134th General Assembly (2021-2022)

AI Summary

  • Urges President Biden to work with Governor Whitmer, Enbridge, and other parties to keep the Enbridge Line 5 pipeline operating safely through the Straits of Mackinac.

  • Line 5 supplies crude oil to PBF Energy's Toledo Refining Co. plant (585 employees) and BP-Husky Toledo Refinery (625 employees), both located in Oregon, Ohio.

  • Closure of Line 5 could significantly impact refinery operations and potentially close a facility, leaving hundreds of Ohioans unemployed and reducing U.S. oil refining capacity.

  • Enbridge has committed to a $500 million replacement project to replace current pipelines with a new tunnel and line buried 400 feet beneath the Straits, using U.S.-made steel and pipe with union labor.

  • Senate directs the Clerk to transmit copies of this resolution to the President of the United States and Ohio news media.

Legislative Description

Urge President make all efforts to keep Enbridge Line 5 operating

Last Action

Refer to Committee: Energy and Public Utilities

11/16/2021

Committee Referrals

Energy and Public Utilities11/16/2021

Full Bill Text

No bill text available