Loading chat...
OH SR211
Resolution
Status
11/10/2021
Primary Sponsor
Theresa Gavarone
Click for details
AI Summary
-
Urges President Biden to work with Governor Whitmer, Enbridge, and other parties to keep the Enbridge Line 5 pipeline operating safely through the Straits of Mackinac.
-
Line 5 supplies crude oil to PBF Energy's Toledo Refining Co. plant (585 employees) and BP-Husky Toledo Refinery (625 employees), both located in Oregon, Ohio.
-
Closure of Line 5 could significantly impact refinery operations and potentially close a facility, leaving hundreds of Ohioans unemployed and reducing U.S. oil refining capacity.
-
Enbridge has committed to a $500 million replacement project to replace current pipelines with a new tunnel and line buried 400 feet beneath the Straits, using U.S.-made steel and pipe with union labor.
-
Senate directs the Clerk to transmit copies of this resolution to the President of the United States and Ohio news media.
Legislative Description
Urge President make all efforts to keep Enbridge Line 5 operating
Last Action
Refer to Committee: Energy and Public Utilities
11/16/2021