Loading chat...
OK HB1384
Bill
Status
3/17/2025
Primary Sponsor
Eddy Dempsey
Click for details
AI Summary
-
Oklahoma Department of Transportation shall require post-installation inspection for any storm pipe that fails a structural dead load test prior to installation.
-
Post-installation inspections must be conducted by a qualified engineer or inspector approved by the Department and verify structural integrity, proper bedding and backfill, joint integrity and alignment, and absence of significant defects.
-
Contractor bears all costs for post-installation inspection and required corrective measures, including removal and replacement, reinforcement, or other remediation as directed by the Department.
-
Oklahoma Department of Transportation shall promulgate rules establishing specifications for inspections, testing protocols, and qualifications for inspectors.
-
Act becomes effective November 1, 2025.
Legislative Description
Transportation; storm pipe inspection by Department of Transportation; inspections; requirements; expense; rules; effective date.
Last Action
Second Reading referred to Aeronautics and Transportation
4/1/2025