Loading chat...

RI H7726

Bill

Status

Introduced

2/12/2026

Primary Sponsor

Jennifer Boylan

Click for details

Origin

House of Representatives

2026 Regular Session

AI Summary

  • Rhode Island Office of Energy Resources must establish a statewide "smart solar permitting platform" that accepts electronic applications 24/7, performs automated code compliance checks, and issues permits instantly for code-compliant residential and small-scale solar systems without manual review.

  • All municipalities must participate in the statewide platform or implement a substantially equivalent automated system within 12 months of the act's passage; the platform will be provided to municipalities at no cost.

  • Solar systems with 25 kW AC capacity or less are exempt from requirements for stamped electrical drawings or engineered plans unless expressly required by state building, electrical, or fire codes.

  • By July 1, 2027, all cities and towns must offer remote virtual inspections via photographs and videos for photovoltaic systems, energy storage, and residential electrical work in one- and two-family dwellings, with final inspections required within 5 business days of request.

  • Electric distribution companies cannot require additional inspections beyond municipal approval as a condition of granting permission to operate residential solar or energy storage systems.

Legislative Description

Amend the state’s online E-Permitting Portal using automated plan review and instant permit issuance.

Public Utilities And Carriers

Last Action

Scheduled for hearing and/or consideration (03/19/2026)

3/13/2026

Committee Referrals

Corporations2/12/2026

Full Bill Text

No bill text available