  • Establishes the "Data Center Siting Act" requiring all data centers with 1+ megawatt electrical load to obtain a certificate from the Public Service Commission before operating in South Carolina

  • Creates three tiers based on electrical load: Tier 1 (1-10 MW) with expedited 75-day review, Tier 2 (11-50 MW) with standard 105-day review, and Tier 3 (50+ MW) with comprehensive 150-day review

  • Sets water efficiency standards with maximum water use effectiveness of 2.0 liters/kWh for Tier 1-2 facilities and 1.5 liters/kWh for Tier 3 facilities, enforced by the Department of Environmental Services

  • Requires infrastructure adequacy assessments evaluating water supply, wastewater capacity, fiber connectivity, and road access, with presumptive approval for sites in existing industrial parks or brownfield locations

  • Mandates environmental buffer zones including one-half mile from wildlife refuges and one-quarter mile from endangered species critical habitat, with annual reporting requirements on water consumption and operational efficiency