Amends Section 39.554(f) of the Utilities Code to allow the Public Utility Commission to approve alternative compensation methods for distributed renewable generation owners outside the ERCOT power grid
-
Currently, owners using single-meter interconnection receive credits when their generated electricity offsets consumption, with excess generation credited under existing subsection provisions
-
The bill makes the existing net metering compensation structure contingent on the commission not approving an alternative method, giving regulators flexibility to establish different compensation approaches
-
Applies specifically to distributed renewable generation and qualifying facilities in areas of Texas served by utilities outside the ERCOT grid
-
Effective date is September 1, 2025
Legislative Description
Relating to the compensation of a distributed renewable generation owner in certain areas outside of ERCOT.