TX SB1740
Bill
Status
2/27/2025
Primary Sponsor
Tan Parker
Click for details
AI Summary
-
Requires the Public Utility Commission to identify critical ERCOT electric grid components vulnerable to electromagnetic pulses (EMP) and geomagnetic disturbances, including substations, control centers, large power transformers, generators, and high voltage breakers
-
Mandates that all high-capacity generation substations and large power transformers in ERCOT constructed or installed after September 1, 2025, be designed to withstand 50 kilovolts/meter E1 electromagnetic pulses and 85 volts/kilometer E3 electromagnetic pulses per federal EMP Commission standards
-
Establishes a grant program to fund protective upgrades to existing critical grid components at risk of failure from electromagnetic threats, with grant recipients prohibited from recovering grant-funded costs through ratepayer charges
-
Creates the Electromagnetic Pulse Protection and Resilience Account in the general revenue fund, composed of legislative appropriations and donations, to support grid protection efforts
-
Requires the commission to conduct biennial reviews of the grant program evaluating costs and public benefits, with findings reported to the legislature
Legislative Description
Relating to the protection of critical components of the electric grid from damage from electromagnetic threats.
State Finances
Last Action
Referred to Business & Commerce
3/13/2025