Exempts advanced nuclear reactors from the requirement that interconnection cost overages (amounts exceeding the transmission-owning utility allowance) be directly assigned to and collected from the generator connecting to the ERCOT grid
-
Defines "advanced nuclear reactor" as a fission-based reactor in three categories: large reactors (400-1400 megawatts), small modular reactors (50-400 megawatts), or microreactors (less than 50 megawatts)
-
Shifts excess interconnection costs for advanced nuclear reactors away from the nuclear generator, meaning these costs would instead be socialized across the transmission system
-
Amends Section 35.004(d-2) of the Texas Utilities Code to create this carve-out specifically for nuclear generation resources
-
Takes effect September 1, 2025