TX SB819
Bill
Status
4/15/2025
Primary Sponsor
Lois Kolkhorst
Click for details
AI Summary
-
Requires renewable energy generation facilities (wind and solar) with capacity of 10 megawatts or more to file an application for "determination of public interest" with the Public Utility Commission before interconnecting to the transmission grid
-
Establishes minimum setback requirements: solar facilities must be at least 100 feet from property lines and 200 feet from habitable structures; wind turbines must be at least twice the turbine height (including blades) from property lines, unless neighboring property owners provide written waivers
-
Mandates public notice requirements including notification to county judges within 25 miles of the facility and publication in local newspapers for at least two consecutive publications
-
Gives the commission 180 days to approve or deny applications, with automatic approval if no decision is made; applications may only be denied if potential harm substantially outweighs benefits to the state or if requirements are not met
-
Exempts solar power facilities located within home-rule municipality boundaries from these requirements; authorizes the commission to impose application fees and adopt enforcement rules
Legislative Description
Relating to renewable energy generation facilities; authorizing fees.
Taxation
Last Action
Referred to State Affairs
4/22/2025