Loading chat...

US HB3451

Bill

Status

Introduced

5/15/2025

Primary Sponsor

Mike Kennedy

Click for details

Origin

House of Representatives

119th Congress

AI Summary

  • Directs the Secretary of the Interior to conduct a feasibility study on designating the Bonneville Shoreline Trail as part of the National Trails System

  • The trail system extends approximately 280 miles from the Idaho-Utah border to Nephi, Utah

  • The trail follows the Bonneville bench, a geological feature created by the prehistoric Lake Bonneville

  • Amends Section 5(c) of the National Trails System Act (16 U.S.C. 1244(c)) by adding the Bonneville Shoreline Trail as item 50

  • Introduced May 15, 2025 by Rep. Kennedy of Utah and referred to the Committee on Natural Resources

Legislative Description

To amend the National Trails System Act to direct the Secretary of the Interior to conduct a study on the feasibility of designating the Bonneville Shoreline Trail.

Public lands and natural resources

Last Action

Referred to the House Committee on Natural Resources.

5/15/2025

Committee Referrals

Natural Resources5/15/2025

Full Bill Text

No bill text available