Loading chat...
US HB626
Bill
Status
1/22/2025
Primary Sponsor
Dan Newhouse
Click for details
AI Summary
-
Requires the Secretary of Interior, Secretary of Energy (via Bonneville Power Administration), and Secretary of the Army (via Army Corps of Engineers) to operate the Federal Columbia River Power System according to the September 2020 Columbia River System Operations Environmental Impact Statement Record of Decision
-
Allows amendments to the operational plan only if all three Secretaries determine the change is necessary for public safety, grid reliability, or because existing requirements are no longer warranted
-
Prohibits any structural modification, action, study, or engineering plan that would restrict electrical generation at FCRPS hydroelectric dams or limit Snake River navigation in Washington, Oregon, or Idaho without explicit future Congressional authorization
-
Preserves authority for routine operation, maintenance, and capital improvements at FCRPS facilities to meet authorized project purposes
Legislative Description
Northwest Energy Security Act
Water resources development
Last Action
Referred to the Subcommittee on Water Resources and Environment.
1/23/2025